We can help you find the right trackway or access mat for your project in under a minute.
Whether it's a festival, construction site, utilities project or rural estate — the right ground protection system depends on your ground conditions, vehicle loads and project type. Use our interactive guide or get in touch directly.
Nationwide Trackway Hire & Ground Protection Specialists
Supply – Install – Site Surveys – Temporary Access Solutions
PREVENT DAMAGE, REDUCE DOWNTIME, AND KEEP VEHICLES MOVING ON ANY SURFACE
CALL US NOW ON +44 (0)330 100 0377
Full UK Coverage | Worksop & Kent Depots | Fast Deployment | Installation Crews Nationwide
At Notus Ground Safe, we deliver practical ground protection solutions designed to reduce environmental impact while maintaining safe, efficient site operations.
Our approach focuses on lowering carbon emissions, minimising ground disturbance, and improving operational efficiency across every project.


Temporary access routes constructed using aggregate (stone) create significant environmental impact due to:
• Quarrying and processing of raw materials
• High-volume transport to and from site
• Heavy plant required for installation
• Ground excavation and reinstatement works
For short-term projects, this results in unnecessary carbon emissions and long-term ground damage.
We provide reusable ground protection systems that eliminate the need for bulk aggregate, reducing both emissions and site disruption.


| Category | Traditional Stone Access | Notus Ground Safe |
|---|---|---|
| Material Use | High (single-use aggregate) | Reusable systems |
| Transport | Multiple HGV loads | Reduced deliveries |
| Installation | Heavy plant, slower | Fast install, less plant |
| Ground Impact | Excavation + reinstatement | Minimal disturbance |
| Waste | High | Near zero |
| Carbon Emissions | High | Up to 60–70% lower |

For a typical temporary access requirement (approx. 1,000m²):
• Reduced HGV movements
• Faster installation and removal
• No reinstatement required
• Multi-tonne CO₂ savings per project
Our operations are designed to reduce environmental impact through:
• Efficient logistics and route planning
• Reduced vehicle movements
• Minimal plant usage
• Faster on-site turnaround
This improves both sustainability and overall project delivery.
Working with Notus Ground Safe helps you:
Reduce Scope 1 and Scope 3 emissions
Improve ESG and sustainability reporting
Align with UK Net Zero targets
Demonstrate measurable environmental improvements
Our trackway solutions are designed with real-world operations in mind — delivering both environmental benefits and reliable performance in demanding conditions.